Documentation

Coastal Stabilization Proof of Concept

The full proof-of-concept package prepared with Basalt International: documented Great Lakes case studies, the five-stage recovery process, the permitting pathway and independent engineering validation. Click any page to read it full size.

18 pages. Use the arrows or your keyboard to move between pages.

Download the document (PDF)

Documented Great Lakes case studies

  • Grand Haven, Michigan

    Before June 1986 · After August 1999

    Federal harbour adjacent beach and dune restoration

    Six layers of failed seawall were removed before the recovery system was installed. The site is now a vegetated dune, and the undercurrent stabilizers that reversed the erosion are buried beneath the sand they captured.

  • Manistee, Michigan

    Before 19 December 1993 · After 11 August 1999

    State project north of the federal harbour

    Undercurrent stabilizers installed north of Scotland Yard Cottages. The project reversed beach erosion north of Orchard Beach State Park.

  • Lakeside, Michigan

    Before 1987 · After June 2000

    Aerial before-and-after documentation

    A narrow beach with limited dune width recovered to substantial beach widening and vegetative growth, with an improved dune and beach profile.

  • Muskegon County, Michigan

    Before November 1985 · After August 1999

    Meinert Park and Duck Lake, public beach and dune restoration

    Visible improvement in dune grass, beach width and shoreline condition. At Duck Lake, severe erosion beside a rock revetment was reversed after the stabilizer system was installed.

  • Douglas, Michigan

    Before and after, dates as recorded on site

    Vanderplas beach restoration, Lake Michigan

    Shoreline reinforced to reduce erosion and protect the bluff, restoring a stable, usable beach with improved access.

Independent engineering validation

25 July 2003Ronald J. Kadelski, P.E., Senior Project Manager, Progressive Architecture Engineering

The shoreline has expanded, the beach has elevated and vegetation on the slope has been re-established.
  • Licensed civil engineer on the 1988 Lakeshore Drive Study in Allegan County, Michigan, where the undercurrent stabilizer technology was recommended as the preferred solution.
  • Documented surveys by WBDC, Inc. and Dr. Straw at Western Michigan University indicated the system was a success in 1990 and 1991.
  • Repeat personal observation confirmed the system performed as predicted over time.

Note on the Army Corps relationship

Basalt International's military-specification composite formulation was designed, tested and accepted in collaboration with the U.S. Army Corps of Engineers. That acceptance relates to the composite seawall material. It is not a permit and not an endorsement of any shoreline design. Permitting is required for every project.