Beach Recovery

Beach Recovery Foundation

Restore your Shore

Since 2002, Beach Recovery has worked to prove that an eroding shoreline can be rebuilt by working with the water instead of against it. The engineering is now carried forward by Basalt International. What remains here is the rest of the work: the art the structures carry, the films that document what returns, and the record of twenty years of shoreline.

Gregory Sarno addresses the United Nations, 20 January 2016.
Three-panel record of one shoreline: crews installing early geotextile tubes along a severely eroded beach backed by riprap and a bluff-top house in 2000; the same stretch in 2003 with a wide sand beach and dune grass returning; and the same view in 2017 with established vegetation across the restored profile.
Circa 2000, 2003 and 2017. Accretion and volume figures [TBD] pending verified survey data.

The record

One shoreline, documented over seventeen years

An early version of the beach recovery system was deployed circa 2000 on a coastline in severe retreat. By circa 2003 the pilot stood as a proof of concept for geotextile containment, and the same view was documented again circa 2017.

Read the record

The Foundation

The work, and the record of it

  • Gallery

    Photographs, time-lapse and the 2016 address at the United Nations.

  • Collaborating Artists

    Art into the Sea: one hundred artists, canvases carried by the nearshore structures, filmed for Saving BÚ.

  • Storefront

    The Foundation's Miami Beach storefront and lounge for Art Basel week, December 2026. Access for Founder Kit holders, sponsors and booth partners.

  • Leadership

    Who leads the Foundation, and the board beside them.

Shoreline projects

Beach Recovery no longer provides shoreline recovery services. The Beach Recovery System is engineered and installed by Basalt International, an independent company. All inquiries about site assessment, design or installation should be directed to them.

Basalt InternationalBasalt International